New enesim Version for Simulating Electricity Generation and Sharing
The latest version takes planning electricity sharing groups and energy communities to the next level. The improvements will benefit active customers (electricity producers), electricity sharing group managers and electricity sharing organisers.
What's New in enesim?
- Simulation results are now available for individual consumption points and their priority levels, including electricity consumption, electricity used from generation (surplus electricity), percentage of consumption covered and savings in euros.
- Individual electricity prices can be assigned to each consumption point to calculate its savings.
- A new electricity consumption profile generator for consumption points without interval metering.
- An expanded catalogue of consumption point types (residential, municipal, business, specialised facilities, etc.), with sample consumption profiles or standard load profiles.
- Export electricity sharing results to Excel (XLSX) for further processing, in addition to the existing CSV and PNG formats.
- Clearer presentation of summary results above the charts, with interactive recalculation when changing the displayed chart range.
- All chart controls are now also available for consumption point charts, including the option to enlarge charts and view them in full-screen mode.
- View numerical values before rounding by clicking on the displayed figures (MWh, kWh and percentages). For percentages, the calculation formula is also provided.
enesim version 1.1.0, released on 10 September 2026
How Much Electricity Will Each Participant Use, and How Much Will They Save Through Sharing?
The new detailed simulation results, broken down by individual consumption points and priority levels, provide an immediate answer to two key questions: how much shared electricity will each participant use, and how much can they expect to save in euros? This provides an ideal basis for designing the most economically beneficial configuration of an electricity sharing group or energy community.
- For each consumption point and priority group, the results show electricity consumption, the amount of generated electricity used, the percentage of consumption covered and the resulting savings.
- Setting a priority for each consumption point ensures that the generated electricity (surplus electricity) is allocated according to your preferred priority order.
- Each participating consumption point can have its own electricity unit price (EUR/kWh), which enesim uses to calculate savings.
- Simulation result charts are available for each individual consumption point and for groups of consumption points with the same priority.
Electricity Consumption Profile Generator for Consumption Points Without Smart Meters
Since electricity sharing is evaluated in 15-minute intervals, it is useful to have the most accurate possible estimate of electricity consumption patterns even before installing a smart meter (interval metering) and joining an electricity sharing group. If you know at least the total annual electricity consumption in kWh and the type of consumption point, enesim will take care of the rest.
There are two options to choose from:
- An enesim sample consumption profile derived from a similar type of consumption point.
- A standard load profile (TDO) provided by Slovak distribution system operators (SSD, VSD and ZSD).
While the sample consumption profile also includes demand peaks, the standard load profile has a smoother, officially defined shape. Both types of profiles are fully customisable in enesim. This means you can adjust them to reflect the specific consumption patterns of your facility. For example, you can customise operating hours, weekends, public holidays, school holidays, peak demand and baseload consumption. Everything can be tailored to how the building or facility actually operates and consumes electricity. Preset holiday schedules are also available for educational facilities.
Our Tip
VSD and ZSD offer smart meter (IMS) installation for as little as EUR 1. For households, however, this requires switching to the D3 Aktiv distribution tariff, which includes a monthly charge based on the main circuit breaker capacity. Simulating your consumption profile and electricity sharing can help you assess whether installing a smart meter for EUR 1 is worthwhile and whether the savings from receiving shared electricity can offset the higher monthly circuit breaker charge.